The project includes hot-pressing fixtures, stackers, restraint plywood, pallets, logistics roller lines, static storage locations, etc.; the company is mainly responsible for the overall design, on-site installation and commissioning of the project.
Technical breakthrough points:
● The design of the pressurizing mechanism that exceeds the conventional 10 times the pressure is realized
● Design and implementation of probe mechanism that exceeds conventional 5 times current
● Customized non-standard fork design of tunnel stacker that can directly grasp 4 batteries
● Extra large soft pack battery realizes automatic transportation
super large soft pack battery project